The wind group will officially launch Vestas PowerPlus at the AWEA Windpower 2014 event in Las Vegas next week.
Vestas PowerPlus features a trio of upgrades.
*Power Uprate for the V82-1.65 MW, V90-1.8 MW and V100-1.8 MW turbines, increasing maximum power output from 1.8MW to 2MW, adding 1%-4% to annual energy production (AEP).
*Extended cut-out for the V90-3.0 MW and V100-1.8/2.0 MW, a modification that allows turbines to capture more wind at higher speeds, extending the maximum wind speed limit to 30 m/s from 25 m/s.
*Aerodynamic