The Polar Prince, a dynamically positioned vessel, will be outfitted with a cable lay spread and cable plough to lay and bury the 33 kilovolt amperes (kVA) lines in around 20 metres of water, as well as survey and remotely operated vehicle spreads.

Subocean was contracted by Fluor on behalf of Greater Gabbard developer Scottish & Southern Energy for the job.