The wind farm consists of 10 REpower turbines.
RWE chief executive Hans Bünting says: “Our beacon project in the expansion of renewables in the Rhenish mining area is now contributing power to the grid."
The utility's Jüchen project will add another wind farm to the region at the end of this year, he adds.
The Titz project was developed along with Hückelhoven BMR Windenergie, and is the first wind farm in the mining area of Hückelhoven.
The