The MultiLife system, which has been shown in studies to have the potential to lengthen gearbox bearings life by more than 500%, will be run in the 600kW Vestas machine as part of the UK Department of Energy and Climate Change’s OWDIn (Offshore Wind Drivetrain Innovation) project.
“Reliability is key for wind turbines, particularly offshore, and bearing failures are a significant cause of wind turbine loss of production, unplanned maintenance, and consequently unnecessarily high cost of energy for wind farm operators, investors and ultimately the consumer,” says Ricardo global head of clean energy and power generation Paul Jordan.
“The