The flagship, which would feature as many as four 6MW turbines set into a super-strength Welcox structured steel platform, is planned to be moored in 40-50 metres of water in the Baltic Sea by 2017.

"This new capital will enable us to intensify our design work and the formation of a Swedish consortium that will build our first platform,” says Hexicon chief executive Henrik Baltscheffsky.

The