Each monopile will support a 5MW XEMC-Darwind XD115 permanent magnet direct-drive turbine with a 115-meter rotor diameter. The rotor, generator and nacelle together weigh 281 tons.
Bolano says the foundations will be installed in between 32- and 40-feet of water. Each one will be 3,700-feet (1,127 meters) apart. The turbines will be clearly visible from Atlantic City’s famous oceanfront boardwalk.
The turbine array will be connected with a 34.5kV