EGP won the development rights as part of the “Sureste 1, phase 2” tender, organised by the Mexican government’s electricity agency.

The $130m project will be built on the Isthmus of Tehuantepec – the shortest distance between the Gulf of Mexico and the Pacific Ocean – in a wind regime that EGP characterises as very good, with an anticipated load factor of more than 40%.

The