“Odebrecht is a good Brazilian partner of Alstom, and for us it was a natural move to enhance our offering to them with wind,” says Faubel.
Alstom offered its alstom ECO 86 turbine as part of the bid, which envisages the construction of the Corredor do Senades 2, 3 and 4, and Vento Argano 1 wind farms in Rio Grande do Sul state, with commissioning scheduled for July 2014.
Alstom