Odebrecht is a good Brazilian partner of Alstom, and for us it was a natural move to enhance our offering to them with wind,” says Faubel.

Alstom ­offered its alstom ECO 86 ­turbine as part of the bid, which envisages the construction of the Corredor do Senades 2, 3 and 4, and Vento ­Argano 1 wind farms in Rio Grande do Sul state, with commissioning scheduled for July 2014.

Alstom