The sale follows on from a breakthrough deal with E.ON for the 750 kilowatt snake-shaped device, which incorporate a range of improvements on the company’s P1 WEC designed to “increase performance and reliability and to reduce build and operations costs”.
Currently in the final stages of fabrication at Pelamis’ Leith Docks facility, the first P2 machine is due to be installed at the European Marine Energy Centre (EMEC) in Orkney later this year.
“The