The first phase of the agreed project will centre on a prototype designed for “typical wave conditions” near Turkey’s coastline, with a pilot facility fine-tuned during 2010.

Following testing of the installation, Ünmaksan and Langlee aim to develop the full-scale wave energy farm, bringing the total investment cost to around NKr1bn ($165m).

“Ünmaksan has analysed more than 70 different wave power concepts, and we believe Langlee has the most robust technology and cost-effective solution,” says Ünmaksan’s managing director Serhat Kan.

“The