EGPNA expects the $290m facility to fully enter commercial operation in the fourth quarter.

The project features a distributed design that consists of multiple small-scale solar sites that will deliver benefits such as a reduction in line loss, elimination of transmissioncosts and geographic diversification of generation assets.

Each of the 16 plants will utilize linear axis tracking devices to maximize efficiency and production, and will interconnect into the off-taker's distribution system - providing energy and capacity to the local distribution network.

"The