JDR will design and manufacture 105km of cable for the project, including a new, low-cost "coilable" 630mm copper core cable that can be a stored in an onboard tank and unwound without a conventional power turntable or vertical reel.
"Sandbank is JDR's third German wind farm win and another important step forward in the development of offshore wind energy in Northern Europe," states JDR executive chairman Pat Herbert.
"Our