“After assessing nearby port facilities, the Offshore Terminal South (OTS) at the Port of Sassnitz (FHS) has been selected as the optimum alternative for warehousing, assembly, storing, and transportation of components and wind turbines to the site,” Iberdrola says, adding that some 100,000 square metres have been secured for the foreseen installation period.
Key activities to be hosted in the port include load-in from transport vessels, storage and load-out to installation vessels of the main components of the wind farm, such as foundations, piles, jackets, wind turbines and cables.
Iberdrola