Arise Windpower is acquiringpermits from developer Svenska Vindbolaget to install six turbines at a 12MW project in Gettnabo, southern Sweden.. Work is scheduled to begin this month and the turbines are expected to be operating in September..
The wind farm is Arise's eighth in the region, bringing to 64 thenumber of turbines it has in operation or under construction, with a capacity of about 136MW..
Arise