Conergy on Monday hadalready told Recharge that despite its insolvency, production at its mountingsystems unit in Rangsdorf near Berlin is continuing.
Insolvency administratorSven-Holger Undritz also had said that he is in talks with stake-holder groupsand political representatives about a possible resumption of output at thecompany’s 250MW module plant in Frankfurt (Oder) which was halted onFriday.
Conergy on Friday filed for insolvency after recent negotiations over the entry of a strategicinvestor into its capital collapsed.