A judge has thrown out a legal bid to halt work on America’s largest ever clean energy project, the transmission line set to carry power from the 3.5GW SunZia wind farm in New Mexico.

The 885km SunZia transmission line was in January hit with a court challenge in Arizona by tribal groups that claimed developer Pattern Energy had failed to recognise “overwhelming evidence of cultural significance” on part of the route of the link.