Suction bucket is ready to sail
Load-out of a pioneering three-legged foundation design that could slash the cost of offshore wind power is imminent at Bladt Industries' Aalborg yard, with developer Dong Energy now expecting to lift the structure onto a waiting installation vessel tonight for transport to the Borkum Riffgrund 1 development off Germany.