Suction bucket is ready to sail

Load-out of a pioneering three-legged foundation design that could slash the cost of offshore wind power is imminent at Bladt Industries' Aalborg yard, with developer Dong Energy now expecting to lift the structure onto a waiting installation vessel tonight for transport to the Borkum Riffgrund 1 development off Germany.

The suction-bucket jacket ready to be loaded
The suction-bucket jacket ready to be loaded
Published 20 August 2014, 16:42Updated 27 September 2016, 06:22
Middle East & AfricaOffshore