Armin Bruck, managing director of Siemens India, says the 200-megawatt (MW) facility will be commissioned in 2012, and may eventually be expanded to around 500MW.
Bruck says the factory’s location has been narrowed down to “two or three” sites in the states of Tamil Nadu and Gujarat. “We’re talking with these states and should be able to take a final decision within a few weeks,” he says.
Oliver