The world largest turbine, GE’s Haliade-X, now in the final stages of prototyping in the Netherlands, could soon be testing new robotics technology that could ‘drastically’ reduce the cost of blade inspection and repair, a large component of an offshore wind farm’s spend on operations.

Green is the new black. Subscribe to Accelerate

Get the market insight you need into the global oil & gas industry's energy transition – from the new newsletter from Upstream and Recharge.