The N131/3300 machine, which has a hub height of 164 metres, flies 65.5-metre blades rotating out to reach a total height of 230 metres.
The 3.3MW turbine, on Kreuzberger & Spengler Regenerative Energie's Hausbay-Bickenbach wind farm in Rhineland-Palatinate state, sits atop a 164-metre hybrid tower, made up of a 100-metre concrete structure and two tubular steel segments that can be assembled in less than two weeks.
"The