Mainstream Renewable Power said it’s on track with 340MW of Chilean wind power after lining up OEM Senvion to supply the turbines.

The two wind farms – Tchamma and Cerro Tigre – comprise the first chunk of 1.3GW of wind and solar Mainstream won in Chilean government power auctions in 2016.

The Ireland-based developer signed a conditional deal for 37 Senvion 4.2M148