GE beefs up Haliade-X to 14MW for final Dogger Bank stage
Powered-up version of turbine lined up to supply third stage of 3.6GW wind farm off northeast England
Powered-up version of turbine lined up to supply third stage of 3.6GW wind farm off northeast England