GE beefs up Haliade-X to 14MW for final Dogger Bank stage

Powered-up version of turbine lined up to supply third stage of 3.6GW wind farm off northeast England

The Haliade-X nacelle at the UK's Offshore Renewable Energy Catapult.
The Haliade-X nacelle at the UK's Offshore Renewable Energy Catapult.Foto: GE Renewable Energy
Published 18 December 2020, 07:53Updated 18 December 2020, 08:03
GE Renewable EnergyEurope