Vestas and Fred Olsen Windcarrier (FOW) have set the seal on a deal to install the Danish OEM’s turbines at the Baltic Eagle offshore wind farm being developed off Germany by Iberdrola.

The contractor has assigned the Blue Tern jack-up to the job, which will involve erection of 50 Vestas V174-9.5s for the 476MW project, with construction operations slated to start in 2024.