DEME and its local partner CSBC have secured a contract worth more than €300m ($302m) to install foundations, turbines and a substation at the Northland Power-led Hai Long offshore wind projects in Taiwan, confirming a debut for the first specialist vessel built on the island.

The Hai Long 2 and 3 wind farms will be located at 40-50km from the coast of Taiwan at a water depth of 35-55 metres, and have a joint capacity of 1.04GW