Goldwind submitted a joint bid with Dublin-based Mainstream Renewable Power (MRP), but it will immediately acquire the project outright. MRP will stay on in a “central role” until the wind farm is commissioned.
MRP bought the rights to Shady Oaks from local developer FPC Services last year for $1.7bn, as part of a 787MW pipeline of projects.
Shady Oaks will use 71 of Goldwind’s 1.5MW