The Nimbagallu wind farm in the state of Andhra Pradesh will be commissioned by May 2017, according to an online statement.
The terms of the deal — the Spanish group’s first order from Tata Power — were not disclosed.
Gamesa will handle all aspects of installation and will also operate and maintain the project.
The G97-2.0MW class S machines, a tower height of 104 metres, were specifically designed for low wind-speed sites in India.
Gamesa