India confirmed plans for massive wind and solar tendering by March 2020 as it announced it has reached installed capacities of 35GW and 24.3GW respectively for the two sources.

The country’s Ministry of New and Renewable Energy (MNRE) said the tender programme is designed to leave a two-year window for project execution ending with 60GW of wind and 100GW of solar in place.