In Depth: W3G Marine floats concept to handle the heavy lifting

Dutch marine contracting giant IHC Merwede and Scottish offshore engineer W3G Marine (W3GM) have unveiled plans to collaborate on the development of a novel design for a heavy-lift offshore wind turbine installation ship (OWTIS).

In Depth: W3G Marine floats concept to handle the heavy lifting
Published 20 July 2011, 15:38Updated 26 September 2016, 14:41