The 368kW system sits atop a camp housing more than 5,000 workers at the Qusahwira oil field in the UAE desert, and will provide an estimated 610MWh of electricity a year for air conditioning, kitchen appliances and other daytime power demand.
Q-Cells performed the front-end engineering work and supplied more than 1,500 multicrystalline modules to the project, while CCC handled the installation.
Q-Cells