SunEd contracts PermaCity for LA-area rooftop PV
SunEdison has selected developer PermaCity to develop, build and operate 22MW of rooftop PV as part of a contract it won in July 2014 from the Los Angeles Department of Water and Power (LADWP).
SunEdison has selected developer PermaCity to develop, build and operate 22MW of rooftop PV as part of a contract it won in July 2014 from the Los Angeles Department of Water and Power (LADWP).