The first project, Astexol 2, is being built by Spanish contractor Elecnor in the province of Extremadura.
The second is being built in Andalusia by contractor Termosolar Moron alongside Acciona and engineering, procurement and construction (EPC) firm Seridom.
In addition to the technology license, sold through Solar Millennium’s subsidiary Flagsol, the orders include an extensive engineering package to tailor the design for site-specific conditions.
At