The announcement, made after a special assembly of India’s Union Cabinet chaired by Prime Minister Manmohan Singh, confirmed two changes have been made to the solar programme since it was first leaked to the press in early 2009.

First, the target date for the 20 gigawatts (GW) of installed capacity has been shoved back two years to 2022, ostensibly to align it with India’s five-year cycle of planning.