TenneT clears last Riffgat link bombs
A pathway has been cleared for the grid link to Germany’s 108MW Riffgat offshore wind farm following the removal of 30 tonnes of explosive munitions, said transmission operator TenneT.
A pathway has been cleared for the grid link to Germany’s 108MW Riffgat offshore wind farm following the removal of 30 tonnes of explosive munitions, said transmission operator TenneT.