A spokeswoman from the consortium which runs the project – made up ofE.ON, Dong Energy and Masdar – says that the wind farm now has 141 operationalSiemens 3.6MW turbines, for a total capacity of 507MW.

The first phase of London Array will have 630MW of capacitywhen all 175 turbines are brought online in the Spring. The final turbine wasinstalled in early January.

A