SHL installs Meerwind topsides
Seaway Heavy Lifting (SHL) has completed installation of the 3,300-tonne topsides for the transformer station at WindMW’s 288MW Meerwind wind development off Germany.
Seaway Heavy Lifting (SHL) has completed installation of the 3,300-tonne topsides for the transformer station at WindMW’s 288MW Meerwind wind development off Germany.