Renewable energy giant picked to build green power and battery at US nuclear waste site

Next step is for parties to negotiate lease for property to host a minimum 150MW capacity solar farm with a 100MW battery storage system

DoE's Waste Isolation Pilot Plant (WIPP) facility in US state of New Mexico.
DoE's Waste Isolation Pilot Plant (WIPP) facility in US state of New Mexico.Photo: DOE
Published 18 September 2024, 17:57Updated 19 September 2024, 07:19
AmericasUSNextEra EnergyDOEJoe Biden