Olsen speeds Global Tech 1 to 40

Brave Tern ready to begin work at Dogger Bank

Brave Tern and its Bold Tern sister have sped installation along at Global Tech 1

Installation of half of a total of 80 Areva 5MW M5000-116 turbines has been completed at the Global Tech 1 wind farm off the German North Sea coast, and the 400MW plant's operators are optimistic all machines will be installed on schedule by the summer.

Become a Recharge subscriber!

Or try our free trial.

Order Subscription

Already a member?

Login


Recharge Monthly Magazine