Full speed ahead for Vestas/MHI

Final preparations are made as Vestas’ new 20MW test bench is readied for the V164 transmission system trials

Final preparations are made as Vestas’ new 20MW test bench is readied for the V164 transmission system trials

The CEO of the newly-formed joint venture between Vestas and Mitsubishi Heavy Industries (MHI) said it will get the 8MW V164 turbine into serial production as early as the first quarter of 2015.

Become a Recharge subscriber!

Or try our free trial.

Order Subscription

Already a member?

Login


Recharge Monthly Magazine