Gamesa installed the medium- and low-wind machinein early December at its Alaiz, Navarre, R&D facility.

Its rotor spanning 114 metres has a sweep area 38%greater than that of the G97-2.0 MW, and produces 20% more energy a year, Gamesa said.

The group expects to obtain type certification duringthe first quarter of this year.