Boralex secured about €65m ($90m) from Germany’s KfW IPEX-Bank for Fortel-Bonnières andSaint-François wind farms, which use GE 2.85MW turbines.

The developer saidconstruction is underway at both sites, with 23MW due online by the end of thisyear and the rest in early 2015.