The jack-up, working in water depths of 17-24 metres  in the eastern Irish Sea, erected 108 Siemens 3.6MW turbines, along with 30 foundations for the project, being developed by Dong Energy and ScottishPower Renewables.

The vessel installed the first turbine in late September 2013, before ramping up to put in 44 in the last 63 days of the assignment as the Sea Installer transited to and from Belfast.

“This