The order for the 402MW Statoil-Statkraft development will see JDR supply more than 95km of copper core inter-array cable and a range of cable accessories, fabricated out of its UK bases in Cambridgeshire and Hartlepool, with VBMS handling installation duties.

The Dudgeon delivery will encompass two lines: a 185mm and a 500mmcopper conductor cable, along with pulling grips, hang-offs, connectors, fibre-optic patch panels and cable cleats.