Vensys – which is majority owned by and suppliestechnology to China’s Goldwind – said the first 2.5MW direct-drive Vensys 112turbines have been installed at a hub height of 140-metres.

The turbines at the Titting wind farm near Eichstaett,Germany, are installed on concrete/steel hybrid towers supplied by Max BoeglWind.

Vensys said it also used the Titting project to successfullytrial installation of rotor blades after the hub was mounted.

The