Supercomputer to shape US grid

The Peregrine Supercomputer

The Peregrine Supercomputer

The US National Renewable Energy Laboratory (NREL)  has been drafted in by the Department of Energy (DoE) for its supercomputing power, as part of project tackling the role of "big data" in the transformation of the country's grid.

The Peregrine supercomputer, which can perform a quadrillion calculations per second in modelling complex systems, is being looked to to optimise design and build-out of electricity networks, to absorb the rising levels of renewables-based power.

"As industry moves forward to integrate all these renewables, big data is a key piece of the puzzle," states Martha Symko-Davies, business development manager at NREL's Energy Systems Integration Facility (ESIF), which houses the supercomputer.

"The links between modeling and simulation, hardware, and good, bad, and aggregated data – all parts of the whole puzzle – are captured at the ESIF through big data."

NREL computational science centre director Steve Hammond adds: "[The supercomputer] allows us to ask 'what if' questions, and to optimise how these systems are designed and deployed with much higher confidence in their efficiency and robustness."

In January, NREL set up a "virtual link" between ESIF, NREL's National Wind Technology Centre and a number of national labs and universities as the first hub in a network designed so that the organisations can "tap into other's resources and knowledge and not try to recreate it".

The Peregrine supercomputer, an innovative warm-water, liquid-cooled design hatched with Hewlett-Packard and Intel, was opened last September by US energy secretary Ernest Moniz, who said the ESIF would "be a major focus of DoE to help us transform the energy system to the one we need in 2030".

UMaine to test 56-meter blade

02 September 2014 07:42 GMT

Brazil postpones A-5 tender

02 September 2014 01:58 GMT

Brazil approves QGER wind start-up

02 September 2014 05:21 GMT

Warnings on UK funding mechanism

02 September 2014 03:56 GMT

TenneT: Offshore lag continues

02 September 2014 03:16 GMT

Two extra years for Kriegers Flak

02 September 2014 03:07 GMT

Move on Brazilian local content

02 September 2014 10:59 GMT

Heritage fears sink wind project

02 September 2014 12:07 GMT

250MW of Polish wind sold

02 September 2014 11:41 GMT

JDR nets Dudgeon cable deal

02 September 2014 11:16 GMT

INTERVIEW: Hermann Albers, BWE

02 September 2014 09:05 GMT

Atlantic Array data made public

02 September 2014 09:46 GMT

IN DEPTH: Europe's wind capital

02 September 2014 09:15 GMT

Vestas gets 58MW Poland order

01 September 2014 05:44 GMT

IN DEPTH: UK offshore game-changer

02 September 2014 09:12 GMT

Glennmont round raises €500m

01 September 2014 04:34 GMT

Scots grant licence for EOWDC

01 September 2014 03:00 GMT

IN DEPTH: Siemens' bid to stay top

01 September 2014 09:13 GMT

Aikengall extension opposed

01 September 2014 02:31 GMT

Drive to cut UK offshore costs

01 September 2014 01:21 GMT

Become a Recharge subscriber!

Or try our free trial.

Order Subscription

Already a member?

Login


Recharge Monthly Magazine