Moventas debuts lubrication upgrade

Climbing the tower to install Moventas’ FusionDrive inside a turbine in Oregon

Refitting should be complete by August

Drive-train designer Moventas is rolling out a new life-extending gearbox lubrication technology on a batch of turbines at Innopower's Ajos wind farm in Kemi, Finland.

The upgrade, which will be bolted into ten WinWind WWD3 machines as part of a larger service project at the 30MW development, is expected to prolong operation of the main transmission system components "until the end of the turbine lifetime".

The new system is built around extra pumps for the main bearings, adding temperature sensors, changing the coolers and an updated lubrication management logic.

"We have high expectations for this upgrade," says Innopower production manager Raine Laaksonen. "Key main components should last until the end of turbine lifetime.

"Professional maintenance and condition management enables minimising potential risks. High-quality components, reliable solutions and professional partners are the secret to wind power’s success."

Refitting work at Ajos, which is foreseen to take up to five days per turbine, should be complete  by August, according to Moventas’ Nordic service sales manager Teemu Hyytiäinen.

Moventas's gearbox upgrade offering ranges across bearing solution modernisations, ring wheel material and heat treatment changes, and housing enforcements.

UMaine to test 56-meter blade

02 September 2014 07:42 GMT

Brazil postpones A-5 tender

02 September 2014 01:58 GMT

Brazil approves QGER wind start-up

02 September 2014 05:21 GMT

Warnings on UK funding mechanism

02 September 2014 03:56 GMT

TenneT: Offshore lag continues

02 September 2014 03:16 GMT

Two extra years for Kriegers Flak

02 September 2014 03:07 GMT

Move on Brazilian local content

02 September 2014 10:59 GMT

Heritage fears sink wind project

02 September 2014 12:07 GMT

250MW of Polish wind sold

02 September 2014 11:41 GMT

JDR nets Dudgeon cable deal

02 September 2014 11:16 GMT

INTERVIEW: Hermann Albers, BWE

02 September 2014 09:05 GMT

Atlantic Array data made public

02 September 2014 09:46 GMT

IN DEPTH: Europe's wind capital

02 September 2014 09:15 GMT

Vestas gets 58MW Poland order

01 September 2014 05:44 GMT

IN DEPTH: UK offshore game-changer

02 September 2014 09:12 GMT

Glennmont round raises €500m

01 September 2014 04:34 GMT

Scots grant licence for EOWDC

01 September 2014 03:00 GMT

IN DEPTH: Siemens' bid to stay top

01 September 2014 09:13 GMT

Aikengall extension opposed

01 September 2014 02:31 GMT

Drive to cut UK offshore costs

01 September 2014 01:21 GMT

Become a Recharge subscriber!

Or try our free trial.

Order Subscription

Already a member?

Login


Recharge Monthly Magazine