Aneel OKs more new Brazil wind

Brazil's power regulator Aneel has authorised partial start of commercial operations at the 12MW Cerro Chato V and full operations at the 20.7MW Pedra Preta wind farms.

While Cerro Chato, in the southern state of Rio Grande do Sul, was authorised to start three of its six 2MW turbines, Pedra Preta, in the northeastern state of Rio Grande do Norte still lacks a connection to the grid.

Cerro Chato V's other turbines are already undergoing tests and should start commercial operations in the coming days.

It is part of the 90MW expansion of the Cerro Chato complex, which also includes the 10MW Cerro Chato IV, 30MW Cerro Chato VI, 8MW Cerro dos Trindade and 30MW Ibirapuitã I.

Cerro Chato V is owned by federal power company Eletrosul and investment fund Rio Bravo, and sold power at the 2011 auction.

Pedra Preta is owned by private power company CPFL Renováveis and is part of the 78.2MW Macados I wind power complex which sold power in 2010.

Brazil approves QGER wind start-up

02 September 2014 05:21 GMT

Warnings on UK funding mechanism

02 September 2014 03:56 GMT

TenneT: Offshore lag continues

02 September 2014 03:16 GMT

Two extra years for Kriegers Flak

02 September 2014 03:07 GMT

Move on Brazilian local content

02 September 2014 10:59 GMT

Heritage fears sink wind project

02 September 2014 12:07 GMT

250MW of Polish wind sold

02 September 2014 11:41 GMT

JDR nets Dudgeon cable deal

02 September 2014 11:16 GMT

INTERVIEW: Hermann Albers, BWE

02 September 2014 09:05 GMT

Atlantic Array data made public

02 September 2014 09:46 GMT

IN DEPTH: Europe's wind capital

02 September 2014 09:15 GMT

Vestas gets 58MW Poland order

01 September 2014 05:44 GMT

IN DEPTH: UK offshore game-changer

02 September 2014 09:12 GMT

Glennmont round raises €500m

01 September 2014 04:34 GMT

Scots grant licence for EOWDC

01 September 2014 03:00 GMT

IN DEPTH: Siemens' bid to stay top

01 September 2014 09:13 GMT

Aikengall extension opposed

01 September 2014 02:31 GMT

Drive to cut UK offshore costs

01 September 2014 01:21 GMT

Met Office launches German service

01 September 2014 12:43 GMT

Mainstream switches strategy

01 September 2014 12:29 GMT

Become a Recharge subscriber!

Or try our free trial.

Order Subscription

Already a member?

Login


Recharge Monthly Magazine