Duddon link shortlist unveiled

The West of Duddon Sands substation is installed

The West of Duddon Sands substation is installed

UK energy regulator Ofgem has unveiled a shortlist of four consortia for the final bidding stage to own and operate the £311m ($477m) high-voltage transmission link for the 389MW West of Duddon Sands offshore wind farm off Cumbria.

Become a Recharge subscriber!

Or try our free trial.

Order Subscription

Already a member?

Login


Recharge Monthly Magazine