3sun
will
provide
two
areas
of
services
for
the
317MW
Sheringham
Shoal.
Firstly,
a
statutory
certification
and
inspection
service
for
all
the
equipment
serving
the
wind
farm,
including
its
88
turbines,
two
offshore
substations
and
an
onshore
substation
at
Salle,
near
Cawston.
The
company
will
also
offer
general
engineering
services
including
design,
fabrication,
mechanical
and
electrical
installation,
and
retrofit
works.
Sheringham
Shoal
is
owned
equally
by
Statoil
and
Statkraft
through
the
Scira
joint
venture
operating
company.
…