The
project,
to
be
installed
by
the
end
of
2014,
will
be
one
of
South
Korea’s
first
commercial
offshore
wind
farms,
and
the
first
to
use
Samsung’s
7MW
machine.
The
turbines
will
be
installed
in
shallow
waters
off
the
coast
of
Jeju
island’s
Daejeong
County,
with
operation
scheduled
to
start
in
2015.
The
wind
farm
will
be
operated
by
Daejeong
Offshore
Wind
Power
(DOWP),
a
joint
venture
set
up
by
Samsung
Heavy
and
state-run
power
company
Korea
Southern
Power
last
month.
Samsung
Heavy
holds
a
60%
stake
in
the
venture.
If
installation
of
the
Log in to read complete article.