The
turbines
will
be
located
at
Goldwind’s
165MW
Gullen
Range
Wind
Farm
in
New
South
Wales’
Southern
Tablelands.
Goldwind
says
it
has
signed
a
PPA
for
the
project's
output,
but
declines
to
name
the
buyer.
Gullen
Range
is
the
first
major
wind
farm
since
early
2011
to
receive
a
connection
agreement
from
TransGrid.
The
2.5MW
PMDD
turbine
was
evolved
from
the
1.5MW
series,
which
has
seen
over
6000
units
commissioned,
Goldwind
says.
Gullen
Range
will
deploy
73
Goldwind
PMDD
turbines
made
up
of
1.5MW
and
2.5MW
machines.
The
project
could
deploy
a
maximum
of
Log in to read complete article.